Role of the Firm: Subcontractor
Project’s Construction Cost: $2,487,287.40
Project Owner: Airport Gateway South LLC
Services Utilized:
HDPE Pipe, Drain Basins, Catch Basins, Headwalls, Bubble Up Structures, C900 Pipe, DIP Pipe, Fire Hydrants, Manholes, Type K Copper, R&R Asphalt