Delivery Methods
Five Ways To Build With Kinkaid
Whatever procurement path your project takes, we bring the same self-perform crews, open communication, and safety-first planning.
Construction Manager At Risk
As a CMAR, Kinkaid joins the team during design. We help shape the project before it is built, then deliver it under a guaranteed maximum price (GMP).
Our preconstruction team uses HCSS HeavyBid estimating, on-screen takeoff, and design overlays to track cost against each design phase. That lets us flag scope changes early and find value without sacrificing quality or function.
- Constructability & value engineering reviews
- Site investigation with GPR, hydro-excavation & potholing
- Transparent GMP development
- Phased construction & public outreach planning
Job Order Contracting
Job Order Contracts let owners move quickly on recurring and urgent work. Kinkaid mobilizes fast, prices task orders clearly, and self-performs excavation, trenching, utility installation, backfill, and testing.
Our JOC teams deliver flexibility and speed without cutting corners. That work has ranged from replacing booster station piping inside an active El Mirage pump station to deep sewer work for Amazon’s Project Hustle.
- Rapid mobilization on task orders
- Water, sewer & storm drain improvements
- Work inside active facilities & right-of-way
- Clear, consistent cost reporting
Progressive Design-Build
With Progressive Design-Build, the owner selects the team on qualifications first, then design and pricing develop together in stages. There is no need to lock in a price on a concept drawing.
Kinkaid brings constructability input, site investigation, and open-book estimating as the design moves forward. Owners can make informed decisions at every step before committing to a final price.
- Qualifications-based team selection
- Constructability input as design develops
- Open-book, phase-by-phase pricing
- Clear decision points before a final price
Hard Bid & Subcontract Work
On hard-bid public work and as a site utility subcontractor to general contractors, Kinkaid brings the same discipline. We build a baseline CPM schedule in MS Project, integrate it with HCSS HeavyBid and HeavyJob, and track it from day one through closeout.
General contractors including Okland, Layton, McCarthy, and Austin Commercial have trusted Kinkaid with complex site and utility scopes.
- Baseline CPM scheduling
- Daily inspections & on-site testing
- Structured change order process
- Rolling punch lists & clean closeout
Cooperative Purchasing
Cooperative purchasing lets public agencies use an existing, competitively awarded contract to get work moving without starting a brand-new procurement.
Whatever the contract vehicle, owners get the same Kinkaid crews, clear pricing, and job-specific safety planning we bring to every project.
- Faster path from need to notice-to-proceed
- Competitively awarded contract pricing
- Self-performed crews and equipment
- Same safety and quality standards on every job
The Right Delivery Method For Every Owner
Kinkaid partners with municipalities, utilities, and general contractors under the delivery method that fits the project. That ranges from hard bid and cooperative purchasing to Construction Manager at Risk (CMAR), Job Order Contracting (JOC), and Progressive Design-Build.
No matter the method, our approach stays the same: early collaboration, honest pricing, and proactive risk management. Kinkaid’s crews self-perform the majority of the work, so quality, safety, schedule, and cost stay under our control.
-
Early Collaboration
Constructability reviews and budgets from the earliest design stages.
-
Best-Value Subcontracting
Qualifications-based selection, never price alone.
-
Self-Performed Work
About 80% of our work is done by our own crews.
From First Look To Final Walkthrough
A proven, step-by-step approach that keeps owners informed and projects on budget.
- 01
Investigate The Site
We verify underground utilities with GPR, hydro-excavation, and potholing, and coordinate early with Arizona 811 and utility owners.
- 02
Build The Budget
Detailed estimates, value engineering, and constructability reviews lead to a transparent GMP.
- 03
Select The Best Team
Annually prequalified subcontractors compete, with at least three bids per division, chosen on qualifications and value.
- 04
Build & Close Out
Daily inspections, real-time cost tracking, and a final walkthrough with the owner and stakeholders.
Recent Public Work
A selection of the water, sewer, and storm drain work Kinkaid has delivered for Arizona municipalities.
Avondale Water & Sewer Improvements
City of Avondale · 3,831 LF of 12" DIP water main with HDD at the I-10 interchange, plus 548 LF of 12" sewer bored beneath 107th Ave.
Alto Well Site Booster Pump Piping
City of El Mirage · JOC replacing booster pump piping and valves in an active station.
Mesa Water Service Replacement
City of Mesa · 400+ residential water services replaced with resident-first outreach.
Trusted By The Teams We Build With
“When challenges arise that are unforeseen, Kinkaid is always there with the sleeves rolled up. They come with solutions that serve the overall team and project. This level of care is hard to come by.”
“They are an honest, reasonable contractor who does what they say and more. I would not hesitate to have them on any of my projects in the future.”
“The work was appropriately staffed, supervised, and managed. We would not hesitate to recommend Kinkaid to other contractors seeking a quality site utility contractor.”
Ready For Your Next Public Project
Kinkaid is licensed in Arizona under ROC 299009 KA (Dual Engineering) and backed by an experienced preconstruction, project management, field, and safety team.
We understand the importance of maintaining business access, coordinating with utility providers, and keeping the public informed on every project.
- ROC 299009 KA (Dual Engineering)
- MAG standards experience
- Industry-leading 0.66 EMOD
- 2021 Platinum Safety Award
- Qualifications-based subcontractor selection
- Experienced public outreach partners
Planning A CMAR Or JOC Procurement?
Our preconstruction team would love to talk through your project and schedule.