Our Work

Six Market Segments, One Standard

Site development and underground utilities for the places Arizona and Utah depend on, from mission critical facilities and hospitals to schools, airports, and city infrastructure.

Scroll
Where We Work

Explore Our Market Segments

Every market has its own owners, rules and pressures. Knowing them is how we keep each job safe, on schedule and easy to work with.

FEATURED PROJECTS

Recent Work Across Our Market Segments

Mission Critical

Discovery

Western Industrial Area

19,000+ LF of combined piping for fire lines, domestic water, industrial wastewater, and process water.

View Project Details →
Public Works

Avondale Water & Sewer Improvements

Avondale, AZ

3,831 LF of 12" ductile iron water main with HDD at the I-10 interchange, plus 548 LF of 12" sewer bored beneath 107th Ave.

View Project Details →
Commercial

Destination Gateway

Mesa, AZ

4,600+ LF of water line, 2,700+ LF of sewer, nine fire hydrants, and RCP storm drain with 19 catch basins.

View Project Details →
Healthcare

BSMC

Banner Health Center

Fire line, private water and storm capture with 30+ drain and catch basins to carry parking lot runoff into the retention basins.

View Project Details →
Education

Agua Fria Arts Academy

Litchfield Park, AZ

4,000+ LF of private water, two StormBrixx underground retention systems, 20+ storm drain basins, and 2,000 LF of ductile iron sewer.

View Project Details →
Aviation

The Landing at Falcon Field

Mesa, AZ

Phased offsite utilities and site grading, including 3,500+ LF of water and fire, 4,000+ LF of sewer, and 750,000+ SF of building pad grading.

View Project Details →
Mission Critical

ASM

ASM America, Inc.

5,000+ LF of DIP fire and domestic water and 5,500 LF of storm drain to serve the site and buildings.

View Project Details →
Public Works

Alto Well Site Booster Pump Piping

El Mirage, AZ

Job Order Contract for the City of El Mirage: 80 LF of booster pump piping and 12" valves, prefabricated from LiDAR scans and finished in 11 days.

View Project Details →
Commercial

Converge

Converge Industrial Park

Repair project replacing a failed fire line at an existing facility: 5,300+ LF of 12" C900 at an active facility.

View Project Details →
Healthcare

HonorHealth

Sonoran Medical Center

2,000+ LF of sewer, 4,200 LF of water, and 3,000 LF of HDPE storm drain to connect the building to city infrastructure.

View Project Details →
Education

EVIT

East Campus Phase II, East Valley Institute of Technology

Fire and domestic water, onsite sewer, and 1,500+ LF of 120" CMP underground storm water retention tanks.

View Project Details →
Aviation

Sky Harbor Terminal 4

Phoenix Sky Harbor International Airport

Airside and landside sewer, storm drain and water work to serve Terminal 4.

View Project Details →
Public Works

Mesa Water Service Replacement

Mesa, AZ

More than 400 aging water services replaced across residential neighborhoods with resident-first communication.

View Project Details →
Commercial

Mesa Grandview

Mesa, AZ

Wet utility and grading package for onsite and offsite improvements, including 300,000+ CY of cut to fill.

View Project Details →
Public Works

UDOT 7800

Utah

Concrete pipe work inside a sheet-pile shored excavation for the Utah Department of Transportation.

View Project Details →
Commercial

Paradise Valley Mall

Paradise Valley, AZ

Eight-phase utility renovation with storm drain, sewer, and waterlines, much of it built overnight in busy arterial streets.

View Project Details →
Commercial

Project Hustle (Amazon)

Goodyear, AZ

Lift station, 2,500 LF of force main, and 5,000 LF of gravity sewer at depths over 25 feet.

View Project Details →
Commercial

Life Time Fitness

Lehi, UT

Site work for a new Life Time athletic club in Lehi, Utah.

View Project Details →

Have A Project In Mind?

Bring Kinkaid in early and we will help you plan the scope, schedule, and budget.