Our Work
Six Market Segments, One Standard
Site development and underground utilities for the places Arizona and Utah depend on, from mission critical facilities and hospitals to schools, airports, and city infrastructure.
Explore Our Market Segments
Every market has its own owners, rules and pressures. Knowing them is how we keep each job safe, on schedule and easy to work with.
Recent Work Across Our Market Segments
Discovery
Western Industrial Area
19,000+ LF of combined piping for fire lines, domestic water, industrial wastewater, and process water.
View Project Details →
Avondale Water & Sewer Improvements
Avondale, AZ
3,831 LF of 12" ductile iron water main with HDD at the I-10 interchange, plus 548 LF of 12" sewer bored beneath 107th Ave.
View Project Details →
Destination Gateway
Mesa, AZ
4,600+ LF of water line, 2,700+ LF of sewer, nine fire hydrants, and RCP storm drain with 19 catch basins.
View Project Details →
BSMC
Banner Health Center
Fire line, private water and storm capture with 30+ drain and catch basins to carry parking lot runoff into the retention basins.
View Project Details →
Agua Fria Arts Academy
Litchfield Park, AZ
4,000+ LF of private water, two StormBrixx underground retention systems, 20+ storm drain basins, and 2,000 LF of ductile iron sewer.
View Project Details →
The Landing at Falcon Field
Mesa, AZ
Phased offsite utilities and site grading, including 3,500+ LF of water and fire, 4,000+ LF of sewer, and 750,000+ SF of building pad grading.
View Project Details →
ASM
ASM America, Inc.
5,000+ LF of DIP fire and domestic water and 5,500 LF of storm drain to serve the site and buildings.
View Project Details →
Alto Well Site Booster Pump Piping
El Mirage, AZ
Job Order Contract for the City of El Mirage: 80 LF of booster pump piping and 12" valves, prefabricated from LiDAR scans and finished in 11 days.
View Project Details →
Converge
Converge Industrial Park
Repair project replacing a failed fire line at an existing facility: 5,300+ LF of 12" C900 at an active facility.
View Project Details →
HonorHealth
Sonoran Medical Center
2,000+ LF of sewer, 4,200 LF of water, and 3,000 LF of HDPE storm drain to connect the building to city infrastructure.
View Project Details →
EVIT
East Campus Phase II, East Valley Institute of Technology
Fire and domestic water, onsite sewer, and 1,500+ LF of 120" CMP underground storm water retention tanks.
View Project Details →
Sky Harbor Terminal 4
Phoenix Sky Harbor International Airport
Airside and landside sewer, storm drain and water work to serve Terminal 4.
View Project Details →
Mesa Water Service Replacement
Mesa, AZ
More than 400 aging water services replaced across residential neighborhoods with resident-first communication.
View Project Details →
Mesa Grandview
Mesa, AZ
Wet utility and grading package for onsite and offsite improvements, including 300,000+ CY of cut to fill.
View Project Details →
UDOT 7800
Utah
Concrete pipe work inside a sheet-pile shored excavation for the Utah Department of Transportation.
View Project Details →
Paradise Valley Mall
Paradise Valley, AZ
Eight-phase utility renovation with storm drain, sewer, and waterlines, much of it built overnight in busy arterial streets.
View Project Details →
Project Hustle (Amazon)
Goodyear, AZ
Lift station, 2,500 LF of force main, and 5,000 LF of gravity sewer at depths over 25 feet.
View Project Details →
Life Time Fitness
Lehi, UT
Site work for a new Life Time athletic club in Lehi, Utah.
View Project Details →Have A Project In Mind?
Bring Kinkaid in early and we will help you plan the scope, schedule, and budget.